Construction on a Burlington road will last longer than expected

Published August 28, 2023 at 4:01 pm

road construction Burlington

A road in a rural part of Burlington will be closed to traffic a little longer than expected.

Work on No. 8 Side Rd. continues and will be shut down between Guelph Line and Twiss Rd until Friday, Sept. 1.

The closure is needed to replace culverts along the stretch of the road.

Local traffic, emergency vehicles and access to properties in this area will be maintained.

All other traffic will be detoured along Derry Rd. between Twiss Rd. and Guelph Line.

 

 

inhalton's Editorial Standards and Policies advertising