Repairs Needed on the Burlington Canal Lift Bridge

Published March 5, 2018 at 7:31 pm

Drivers are being advised of a lane reduction on the Burlington Canal Lift Bridge starting Monday.

Drivers are being advised of a lane reduction on the Burlington Canal Lift Bridge starting Monday.

There are lane reductions on the bridge from March 5 until March 8 from 9 a.m. until 3 p.m.

A lane will be open in both directions at all times.
Pedestrian and cyclist traffic will be open.
The schedule may change depending on weather conditions, according to the federal government.
insauga's Editorial Standards and Policies advertising